When Margaritas in Portsmouth, NH, had a MMA flooring system that failed after 6 months of use they called New England Epoxy Flooring to remove and install a new Urethane MD flooring system with an average thickness of 3/16". The total removal and installation time was only 3 days. The customer has been completely satisfied with the result of the Urethane MD flooring system and New England Epoxy Flooring.
Pictures of floors before removal
Urethane Flooring
